The 2050 Project: Part II
The 2050 Project: Part II
Building the HFC Network of the Future – Starting Today
ATX’s 2050 Project is designed to assist MSOs in navigating the next phase of the evolution of their outside plants in the most cost-effective manner possible, and without deviating from their inevitable migration to an all-fiber infrastructure. Part I of this series provides a detailed exploration of the 2050 Project, as well as an analysis of the many factors contributing to cable operators’ renewed interest in extending the longevity of their HFC networks through incremental frequency increases, beginning at 1.8GHz.
Moving from the conceptual to the practical, Part II focuses on the DOCSIS® 4.0 specification’s immediate impact on the bandwidth-carrying capacity of the millions of miles of installed coax plant. The document also provides insight into the products, roadmaps and best practices that will assist MSOs in kicking off their long-term HFC evolution strategies.
Readers will also learn:




Subscribe to get the white paper
Opt-in to receive updates from ATX and get instant access to this free white paper: